thescoutranch
TN Transplant - We love living in TX
Oct 24 - Dec 8
Had to address some drainage issues on the side of the Grillzebo. Got the roof dried in with felt paper. My brother came over early one morning and we installed all the shingles in about three hours and beat the rain storm. Also finished the rough in electrical for it. 60 amp service to the Grillzebo, (2) 20 amp circuits and (2) 15 amp circuits.
Had to address some drainage issues on the side of the Grillzebo. Got the roof dried in with felt paper. My brother came over early one morning and we installed all the shingles in about three hours and beat the rain storm. Also finished the rough in electrical for it. 60 amp service to the Grillzebo, (2) 20 amp circuits and (2) 15 amp circuits.